Planned roadworks in the North West – summary for Monday 26 October to Sunday 1 November 2015

by
23rd October 2015
Planned roadworks in the North West– summary for Monday 7 to Sunday 13 August 2017

The following summary of planned new and ongoing road improvements over the coming week is correct as of Friday 16 October and could be subject to change due to weather conditions or unforeseen circumstances. All our improvement work is carried out with the aim of causing as little disruption as possible.

M53 Ellesmere Port

Bridge repairs are taking place and some lane closures will remain in place on the slip roads until the project is completed by the end of November.

M56 Junction 12 Runcorn

The eastbound exit slip road at junction 12 for Runcorn and Widnes closed on 12 October for up to 5 weeks as work continues on the Mersey Gateway bridge project. Drivers will need to travel to junction 11 at Daresbury to join the westbound M56 and travel back to the westbound exit slip road at junction 12 to leave the motorway for Runcorn and Widnes. More information is available at www.merseygateway.co.uk/

M6 Junction 38 Brough to Junction 39 Shap

Work to resurface sections of the southbound carriageway near Tebay Services started on 21 September. Contractors will also install new reflective road studs, replace road markings and carry out repairs to two bridges. Two lanes will be open to traffic during the day, between 6am and 8pm, and one lane overnight, between 8pm and 6am. The project is due to be completed by the end of the week.

M60 Junction 8 Sale to M62 Junction 20 Rochdale

A major scheme is taking place to cut congestion and improve journey times on parts of the M60 and the M62 in Greater Manchester. The scheme will require some overnight closures affecting the full carriageway and slip roads, with a 50mph limit in place for the safety of workers and drivers. The project is due to be completed in autumn 2017

M62 Junction 10 / M6 Junction 21a Croft Interchange

The exit slip roads from the westbound M62 onto the northbound M6, and from the eastbound M62 onto the southbound M6, will be closed overnight, between 8pm and 6am while repair work takes place on the motorway bridges. Drivers will be able to follow clearly-signed diversion routes. Narrow lanes and a temporary 50mph speed limit will also be in place on the slip roads during the day. The scheme is due to be completed in December.

A5036 Litherland

A £1.7 million project to resurface the main road to the Port of Liverpool started on 24 August and is due to finish in February. A 2 ½ mile stretch of the A5036 is being resurfaced from the junction with the M57 and the M58, known as Switch Island, to the junction with Hawthorne Road. All of the work will be carried out overnight to keep disruption to drivers to a minimum, and clearly-signed diversions will be in place when short stretches of the road are closed. Phase 2 of the work started on 11 October.

A556 Knutsford to Bowdon

A £192 million project is being carried out to create a new dual carriageway linking the M56 to the M6 in Cheshire. A temporary 40mph speed limit is currently in place between Bucklow Hill and Bowdon, and the new dual carriageway is expected to open in winter 2016/17. The single slip road (from the southbound A556 onto the westbound M56) at junction 8 of the M56 closed in September for bridge works associated with the wider project. The slip road is now due to re-open in mid-November.

More information is available on the project web page at http://www.highways.gov.uk/roads/roa…on-Improvement

A585 Skippool to Singleton

Work began on 28 September on an 11 to 12 week scheme to improve drainage and footpaths along this section of the route. Work will take place around the clock but temporary traffic signals will only be used overnight. The project should be completed before Friday 18 December

A590 Newby Bridge

Improvement work, including new cycle crossing points, will start on Monday (19 October). Overnight working will involve temporary traffic lights and a 40mph speed limit past the road works. The work will be finished by Friday (30 October).

A66 Appleby

A £1.76 million carriageway reconstruction project near Crackenthorpe began in mid-October and will last until Sunday 20 December. Temporary traffic lights are in place – manually controlled during the day – and a 40mph speed limit will also be in place past the road works.

 

Submit News Contact us with your community, business or sport news. Phone 07581350321

Email ots@otsnews.co.uk

Facebook www.facebook.com/otsnews.co.uk

Twitter  www.twitter.com/onthespot_news

Breaking local news as it happens, searchable archives with photographs, the ability to instantly comment on news articles – there are so many advantages to OTS (Onthespot) News.

If you want your news read locally online then send it to ots@otsnews.co.uk – relying only on the newspaper is to restrict yourself to an ever reducing audience.